Photos from on-site jobs: cabling, racks, registers and network gear. Tap a photo to enlarge.
2023 7 photos
Patch panels, switching and UPS in a finished rackFiber and copper terminations in an equipment rackBackboard build-out: punch-downs, patching and powerEquipment transit case sealed for site deliveryHardware staged on site ahead of a phased rolloutNetworked receipt printer configured at a point of saleReplacement component unpacked from anti-static wrap
2022 9 photos
Access switch and fiber uplinks dressed in an open rackThin client opened for drive and memory servicePaging and intercom amplifier stack in a facility rackCore switch stack patched during a campus network refreshController cabinet wiring during a systems cutoverRack-mount server seated and cabledLow-voltage panel with UPS backup on a service callPoE access switch installed in an intermediate closetTerminated RJ45 verified with a cable tester
2021 7 photos
Recovered drives staged and sorted on warehouse rackingDDR memory modules sorted by capacity for reuseFiber demarcation unit mounted with protective innerductTelephony backboard: 25-pair punch-downs to MPOE and MDFParts bin staged and labeled by memory specEnterprise hard drive inspected before wipe and resaleMemory modules bagged and boxed for redeployment
2020 1 photos
Cat5e drop terminated and labeled at a wall plate
Ask about Lloyd's services
Automated assistant. It can be wrong. Please don't share personal or payment details here.